Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 40 results ...

Abou-Zeid, A M K (1993) Data flow identification to support project automation/integration and productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Al Sabah, R (2014) Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ammar, A I (2001) Profitability of electrical contractors using financial and economical data: The effect of company's size, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chang, C-K (2004) Quantifying the impact of schedule compression on construction labor productivity, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chen, Y (2008) A highway work zone design and traffic management decision system, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Chin, C-S (2008) An investigation to improve construction information flows, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Choi, J (2003) Strategic motives underlying M and A transactions in the United States public construction industry, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Choi, K (2008) Applications of its archived data for improved highway planning and design, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Daegu, C (2009) Construction information database framework (CIDF) for integrated cost, schedule, and performance control, Unpublished PhD Thesis, , University of Wisconsin - Madison.

  • Type: Thesis
  • Keywords: construction project; standards; communication; information system; project success; professional
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305030131
  • Abstract:
    In the information age today, information is getting more and more important. A project success is directly related to continuous access to accurate project information. A construction project involves an enormous amount of information becoming more complex, specific, and professional. Though a lot of effort including information models, information tools, and standards has been applied to overcome these challenges, poor communication and information chaos still remain as an unsolved assignment in the construction industry. In the project execution phase, project participants understand who is going to do what and how, where, why, and when they are going to do it. It is virtually impossible to identify all potential situations by using a current information system. Five fundamental problems are identified within the research scope; limited focus to a specific problem and its partial solutions, lack of an integrated information framework, a fixed and single-directional representation method, sophisticated applications, and lack of an appropriate evaluation method. Then, an inevitable question remains: "how does an information system provide the right data to the right person at the right time to the right place?" The primary purpose of this research is to provide a guideline on how to gather, record, track, share, and retrieve project execution data with an accurate, efficient, and consistent manner. The research proposes a Construction Information Database Framework (CIDF) that supports various management functions having multi-perspectives and multi-levels of detail with a single database structure. For an effective response to the topic, the research adopts four different parts of methodology; a faceted structure composed of independent 5W1H (: WHAT, WHERE, WHEN, WHO, WHY, and HOW) information units (the structural part); semantic-rich, multi-functional, and multi-perspectives database (the semantic part); a familiar, easily accessible, and flexible information system (the application part); and an appropriate methods to measure the model's practicability (the evaluation part). These parts of methodology are integrated into one predefined structure, CIDF. In the domain of construction execution database, the CIDF allows information users to access multi-directional, -dimensional, and -levels of detail information with relatively small amount of overhead effort compared with current information tools.

De Cicco, S (2004) Design and development of an information management system for highway construction specifications, Unpublished PhD Thesis, , University of Wisconsin - Madison.

El Asmar, M (2012) Modeling and benchmarking performance for the integrated project delivery (IPD) system, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Gunduz, M (2002) Change orders impact assessment for labor intensive construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Iskandar, K A S (2018) A new comprehensive mathematical assessment methodology for team collaboration and integration and project performance in healthcare construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Jang, H (2002) Construction material logistics: Project manager level of satisfaction and facilities layout planning, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Kang, M M K (2014) Development of an expert system for sustainable pavement preservation strategies (es2p2s), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies), Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, J C (2010) Evaluating the sustainability of construction with recycled materials, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, S (2000) Spatial model and decentralized path planning for construction automation, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Lee, T S (1990) Detection of collusion in highway construction contract bidding, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Lukito, P K (2000) A framework for environmental monitoring infrastructure investment planning in developing areas, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Menches, C L (2006) Effect of pre-construction planning on electrical project performance, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Onaran, B E (1996) The construction of professional identity in architecture and landscape architecture: Convictions about skills, knowledge, and professional roles in design, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Paap, K (1999) Masculinity under construction: Gender, class, and race in the construction industry, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Rungjang, K (2013) Public investment for developing port facilities within competitive market, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Schwab, A (2000) Management practices in short-term network organizations: The performance impact of the shadow of the future and psychological contracts in the United States movie industry, 1931--1940, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Shr, J-F (1999) Model development for cost-plus-time bidding applied to Florida department of transportation highway construction, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Sullivan, K T (2004) Quantification of the cumulative impact of change orders on sheet metal labor productivity, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Swider, S C (2008) Behind great walls: Modes of employment among migrant construction workers in China's informal labor market, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors, Unpublished PhD Thesis, , The University of Wisconsin - Madison.

Yi, J S (2003) CAMP (CAse Matching Prediction): A dynamic forecasting model for periodic expenditures of residential building projects, Unpublished PhD Thesis, , University of Wisconsin - Madison.

Yoo, Y J (2014) The development of green building performance assessment tool (GBPAT), Unpublished PhD Thesis, , University of Wisconsin - Madison.